REED-PE-Squeeze-Off-Tool-PES-series
Ideal for PE pipe repair, temporary squeeze-off, and flow control in municipal, construction, and industrial jobsites.
- PE Pipe Squeeze-Off Application: Designed for temporary squeeze-off and flow control during PE pipe repair.
- Manual / Hydraulic Options: PES8 series is available in manual M type and hydraulic H type for different jobsite needs.
- Flexible Clamping Design: PES1 has a fixed bottom; PES2 and PES4 feature an openable bottom for clamping at any pipe position.
- Lightweight Portable Frame: Compact and easy to carry, suitable for outdoor work, confined spaces, and field service.
- Precision Thread Operation: Smooth and low-effort tightening for stable squeeze-off control.
- Hydraulic Professional Setup: PES8H includes hydraulic pump, pressure gauge, and clamps for heavier-duty work.
- Safer Release Control: Optional flow control valve helps manage release speed for improved safety.
- Multi-Standard Compatibility: With safety stop replacement, the tool can be used with IPS and CTS PE pipes.
Model Specifications
Product Details
Temporarily stops flow before PE pipe repair, welding, patching, or replacement work, helping technicians quickly and safely create workable conditions on site.
PES1 features a fixed bottom for standard squeeze-off work, while PES2 and PES4 have open-bottom designs for clamping at any position on the pipe.
The compact and lightweight frame is suitable for confined spaces, outdoor construction, and field maintenance work.
Precision-thread design helps make the squeeze-off process smoother and reduces operating effort on site.
The PES8 series provides manual M type and hydraulic H type options, allowing selection based on job intensity and pipe conditions.
The PES8H hydraulic model includes a hydraulic pump, pressure gauge, and fixture, making it suitable for higher-load pipe operations.
By changing safety stops, the tool can be used with IPS and CTS PE pipes, improving overall tool versatility.
Converts PES2IPS to PES2CTS.
Converts PES2CTS to PES2IPS.
Note: CTS refers to copper tube size; IPS refers to iron pipe size.
Effectively stops water or media flow inside the pipe, making welding, patching, and replacement work easier.
Suitable for temporary squeeze-off in municipal water supply, drainage, or other PE pipe system construction.
Can be used for emergency handling, routine maintenance, and sectional construction in industrial PE piping systems.
The compact frame is easy to carry, making it suitable for outdoor, confined-space, or field maintenance work.



